How to decorate a catering kitchen: a comprehensive guide from design to implementation
In the catering industry, the kitchen is the core area, and its decoration design directly affects operational efficiency and food safety. Among the hotly discussed topics on catering decoration recently across the Internet, kitchen layout, equipment selection, ventilation systems, etc. have become the focus. This article combines popular discussions in the past 10 days to provide you with a structured data guide to help you complete kitchen renovations efficiently.
1. Core data reference for catering kitchen decoration

| Project | industry standard | Hot tips |
|---|---|---|
| Area ratio | Accounting for 20%-30% of the total business area | Small restaurants can be compressed to 15% (the layout needs to be optimized) |
| Functional partition | 5 basic areas (storage/rough processing/cooking/meal preparation/cleaning) | A new "prefabricated area" will be added in 2023 (a hot topic on Douyin) |
| Moving line design | One-way cycle (raw → cooked → served) | U-shaped layout search volume increased by 45% monthly (Baidu Index) |
| ventilation standards | Air exchange rate ≥ 60 times/hour | Xiaohongshu discusses the installation tips of "electrostatic oil fume purifier" |
2. Three major trends in kitchen decoration in 2023
1. Modular equipment becomes the new favorite
The Weibo topic #kitchenequipmentmetamorphosis# has been read more than 100 million times, and attention to modular equipment such as movable steam ovens and modular workbenches has increased by 72% month-on-month. This type of equipment can achieve: ① Flexible adjustment according to the menu ② Save 15%-20% space ③ Reduce later modification costs.
2. Popularization of intelligent management systems
Zhihu’s hot list shows that searches for kitchen equipment with IoT functions have tripled. Recommended configurations: ① Automatic monitoring of temperature and humidity ② Intelligent inventory warning ③ Remote diagnosis of equipment faults (a case of a certain brand shows that it can reduce operation and maintenance costs by 30%).
3. Environmentally friendly materials are popular
Among the top 10 recent decoration videos on Station B, 7 involve environmentally friendly materials: ① antibacterial stainless steel countertop (heat +58%) ② food-grade silicone sealing strip ③ zero-formaldehyde fireproof board. Pay attention to the CMA certification mark.
3. Key points for regional decoration
| functional area | Decoration focus | Budget allocation recommendations |
|---|---|---|
| cooking area | ① Anti-slip floor tiles (friction coefficient ≥ 0.6) ② The height of the stove is customized according to the height of the chef | Accounting for 25%-30% of the total budget |
| Refrigerated area | ① Dual circuit protection ② Make a waterproof slope on the ground | 15%-20% (including equipment) |
| washing area | ① 304 stainless steel sink ② Drainage pipe diameter ≥75mm | 10%-12% |
4. Guide to avoid pitfalls (from recent complaint data)
1.circuit problem: A certain Internet celebrity restaurant did not have a dedicated line for the oven, so the circuit breaker tripped three times a day on average (the main reason for the 1-star negative review on Dianping)
2.Drainage hazards: A hot pot restaurant rebates water due to insufficient slope, and the average monthly dredging cost exceeds 5,000 yuan.
3.Acceptance blind area: Douyin exposure cases show that 38% of kitchens have not done automatic gas leakage cut-off tests
5. Decoration process timeline
| stage | key action | Recommendation cycle |
|---|---|---|
| Preparatory period | ① Apply for decoration permit ② Equipment selection | 7-15 days |
| construction period | ① Concealed works (water, electricity/ventilation) ② Equipment installation | 20-45 days |
| acceptance period | ① Health license pre-examination ② Equipment joint debugging | 3-7 days |
Recent data shows that the project completion time of a professional kitchen design company is 40% shorter than that of self-renovation. It is recommended that if the budget allows, priority should be given to a decoration team with catering qualifications. After the renovation is completed, it is recommended to conduct a 72-hour simulated operation test, focusing on checking the equipment load capacity and line flow smoothness during peak hours.